TEMPLATESINSPECTION PLANFree Excel (.xlsx) download

Inspection Plan Template

One sheet that says what to check on a part, at which stage, with which gauge, how often and what to do when it fails. The sheet works out the limits and flags any gauge too coarse for the tolerance.

Who this template is for

Quality and manufacturing engineers planning inspection for a new or changed part, and inspectors and operators who carry out the checks.

When to use it

Standards it supports

How to use this template

  1. List the characteristics — go through the drawing balloon by balloon and add one row per characteristic you will verify, plus material and labeling checks.
  2. Enter nominal and tolerances — type the nominal and the minus and plus tolerance as positive numbers; the limits calculate.
  3. Classify and stage — mark each row Critical, Major or Minor and choose where it is checked: receiving, in-process or final.
  4. Choose the gauge — enter the method and gauge resolution and replace any gauge the sheet flags with "Check gauge".
  5. Set sample, frequency and reaction — state how many parts, how often, what to do on a failure and where the result is recorded.

Tip: Write the reaction plan as actions, not "notify quality". The operator must know whether to stop, what to quarantine and back to which check.

What's inside the template

1

Header

Part number and revision, drawing, minimum tolerance-to-resolution ratio, prepared by and date

2

Characteristic

Balloon number, description, nominal and tolerances

3

Limits

Calculated lower and upper specification limits

4

Classification and stage

Critical, Major or Minor, and receiving, in-process or final

5

Method and gauge check

Gauge, resolution and the tolerance-to-resolution ratio with an OK or Check gauge flag

6

Sampling and reaction

Sample size, frequency, reaction plan and record

Example: a completed template

Example Plan for a turned spacer, part EX-3100 rev B, at Example Precision Co., a fictional machine shop. Every characteristic, tolerance and frequency is invented for illustration.

Inspection plan

#CharacteristicLimitsClassStageGauge (resolution)RatioCheckSample / frequency
1Outside diameter 20.00 −0.05/+019.95 – 20.00MajorIn-processMicrometer (0.001)50OK1 every 25 parts
2Length 15.00 ±0.1014.90 – 15.10MajorIn-processCaliper (0.01)20OK1 every 25 parts
3Bore 8.00 +0.02/−08.00 – 8.02CriticalIn-processBore gauge (0.001)20OK1 every 10 parts
4Chamfer 0.5 ±0.20.3 – 0.7MinorFinalChamfer gauge (0.1)4Check gauge5 per box
5Hardness 30 ±2 HRC28 – 32MajorReceivingHardness tester (0.1)40OK3 per lot
6Label and count—MinorFinalVisual——Every box

Summary

Characteristics6
Critical1
Gauges to check1
Receiving / in-process / final1 / 3 / 2

The math in this Example

How to fill in each field

FieldWhat to enterExample
Char #The balloon number on the drawing, so the plan, the drawing and the inspection record line up.3
Tol − / Tol +Both as positive numbers. For a one-sided tolerance, enter 0 on the other side.0 / 0.02
ClassCritical for safety, fit or function the customer has flagged; Major for function; Minor for cosmetic or non-functional.Critical
StageWhere the check happens: receiving, in-process or final. A characteristic can have rows at more than one stage.In-process
Gauge resolutionThe smallest step the gauge reads, in drawing units.0.001
Tolerance ÷ resolution (calculated)Tolerance width over resolution, compared with the ratio in the header (10 by default, a common rule of thumb).20
Sample size / FrequencyHow many parts and how often: per lot, per hour, every n parts, first and last piece.1 / every 10 parts
Reaction planWhat the inspector or operator does on a failure: stop, contain back to the last good check, notify, record.Stop, quarantine since last good check

Common mistakes

Frequently asked questions

What is the difference between an inspection plan and a control plan?

A control plan covers how the whole process is controlled, including process parameters. An inspection plan focuses on which product characteristics are checked, how and when. In many shops the inspection plan is the detail behind the control plan rows.

What is the 10:1 rule?

A rule of thumb that the gauge should resolve at least one tenth of the tolerance width. The sheet uses 10 by default; change the header if your customer sets another ratio.

How do I choose the sample size?

Base it on risk and process capability. Capable, stable processes need fewer checks; critical characteristics and new processes need more. Lot sampling plans such as AQL tables are one option for receiving and final inspection.

Should every drawing dimension be on the plan?

Every characteristic should be verified somewhere, at first article if not in production. The production plan focuses on characteristics that can vary from part to part.

See also

COPLAIN AI PLATFORM

Generate yours automatically from your existing docs

Coplain turns each inspection row into an illustrated inspection work instruction, with the gauge, the method and the reaction plan on the page.

Generate yours automatically with Coplain →

Related Tools & Templates