TEMPLATESSETUP APPROVALFree Excel (.xlsx) download

First Piece Inspection Checklist

An Excel checklist for approving a setup before the run starts. Enter nominal and tolerance; the sheet works out the limits, marks each measurement PASS or FAIL, and returns APPROVED, INCOMPLETE or REJECTED for the first piece.

Who this template is for

Machine operators, setup technicians and inspectors in machining, fabrication and molding shops, and the quality engineers who define which characteristics a first piece must check.

When to use it

At the start of every new job, and again after a tool change, program edit, fixture change, material lot change or machine repair, before parts are released for the full run.

Standards it supports

How to use this template

  1. Fill the header — record part number, revision, work order, machine, the reason for the first piece, and who ran and inspected it.
  2. List the characteristics — copy the characteristics to check from the drawing or control plan, with nominal and minus and plus tolerance.
  3. Measure and record — measure the first piece with calibrated gauges and enter the value, or OK / NG for attribute checks, with the gauge ID.
  4. Read the decision — any FAIL rejects the piece; adjust the setup and run a new first piece on a fresh sheet.
  5. Release and file — when the decision reads APPROVED, the inspector signs and the run starts. Keep the sheet with the job record.

Tip: Enter the minus tolerance as a positive number (0.10, not −0.10). The sheet subtracts it from nominal to get the lower limit.

What's inside the template

1

Header

Part number, revision, work order, machine, reason for first piece, operator, inspector and date

2

Characteristics

Characteristic, nominal and minus/plus tolerance for each check

3

Limits

Lower and upper limits calculated from nominal and tolerance

4

Results

Measured value or OK/NG, gauge ID and calculated PASS/FAIL

5

Decision

Checks completed, failed and outstanding, and APPROVED / INCOMPLETE / REJECTED

Example: a completed template

Example First piece for Example Precision Co., a fictional machine shop, after a program edit on bracket 10-2240 Rev D. Dimensions and readings are invented for illustration.

Header

Part / revision10-2240 / D
Work orderWO-5512
MachineCNC cell 3
ReasonProgram edit (ECN-2026-041)

First piece #1 (mm)

CharacteristicNominalTol −/+LimitsMeasuredResult
Hole A diameter6.800.10 / 0.106.70 – 6.906.83PASS
Overall length85.000.20 / 0.2084.80 – 85.2085.12PASS
Slot width12.000.00 / 0.0512.00 – 12.0512.07FAIL
Thickness6.350.05 / 0.056.30 – 6.406.33PASS
Burrs and finish (visual)———OKPASS
Part marking legible———OKPASS

Outcome

The math in this Example

How to fill in each field

FieldWhat to enterExample
ReasonWhy a first piece is needed: new job, tool change, program edit, fixture change, material lot or after repair.Program edit (ECN-2026-041)
CharacteristicEach dimension or feature from the drawing or control plan that the setup can affect. Include key attributes such as marking.Slot width
NominalThe drawing value in the drawing’s units. Leave blank for attribute checks.12.00
Tol − / Tol +Both entered as positive numbers. For a one-sided tolerance, enter 0 on the other side.0.00 / 0.05
LSL / USLCalculated limits. Do not type over these cells.12.00 / 12.05
MeasuredThe reading for variable checks, or OK / NG for attribute checks.12.07
Gauge IDThe calibrated gauge used, so the reading can be traced if that gauge is later found out of tolerance.CAL-031
ResultCalculated PASS or FAIL. CHECK LIMITS means a number was entered for a row with no limits.FAIL
DecisionAPPROVED only when every listed check is complete and none failed.REJECTED

Common mistakes

Frequently asked questions

What is the difference between first piece and first article inspection?

First piece inspection approves a setup at the start of a run or after a change, and is repeated often. First article inspection is a full verification of a new or changed part and process, usually done once per revision and in aerospace documented per AS9102.

When is a new first piece required?

Define it in your procedure. Common triggers are a new job, tool change, program edit, fixture change, new material lot and machine repair.

Which characteristics should be checked?

The ones the setup can affect, normally taken from the control plan or flagged on the drawing. Many shops check all dimensions for a new job and a defined subset after a tool change.

Who should approve the first piece?

Typically someone other than the setup person, such as an inspector or lead, so the approval is an independent check. Your procedure decides.

Should we also check the last piece?

Last-piece checks show the process stayed in tolerance through the run. IATF 16949 mentions first-off and last-off comparison where applicable; add a last-piece column if you use it.

See also

COPLAIN AI PLATFORM

Generate yours automatically from your existing docs

Turn your setup and first-piece procedure into a visual job aid with Coplain, so every operator measures the same characteristics the same way.

Generate yours automatically with Coplain →

Related Tools & Templates