Total Runout (GD&T)

Total runout is a GD&T control that limits the full indicator movement over an entire surface while the part rotates on a datum axis and the indicator travels along (or across) the surface. One reading covers roundness, straightness, taper, bend and off-centre error, which makes it the strictest runout control.

Last updated

At a glance

Group
Runout
Datum
Required
Modifiers
None (RFS)

What it controls

Where circular runout resets the indicator at each section, total runout does not. The indicator moves along the full length of the diameter (or across the full face) while the part turns, and the highest-minus-lowest reading over the whole sweep must be within the tolerance.

On a diameter, that one number controls cylindricity and location of the surface relative to the axis. On a face perpendicular to the axis, it controls flatness and squareness of the face to the axis together.

It is specified on bearing seats, seal surfaces along their full width, rotor faces and shafts that must slide through a bore.

The tolerance zone

For a diameter: two coaxial cylinders, centred on the datum axis, the tolerance apart radially. For a face: two parallel planes perpendicular to the datum axis, the tolerance apart.

Unlike cylindricity, the cylinders cannot float: they are locked to the datum axis.

Total runout tolerance zoneA shaft on datum diameters A and B with two dashed lines along its length representing two coaxial cylinders 0.05 apart. An indicator with a horizontal arrow shows it travelling the full length while the part rotates.ABindicator travels the full lengthwhile the part turns: total ≤ 0.05Two coaxial cylinders on axis A-B, 0.05 apart.
Original Coplain diagram, not to scale; zones are exaggerated so they are visible.

Does it need a datum?

Total runout always needs a datum axis, often a common axis from two bearing journals (A-B), or a face plus a diameter.

Which modifiers apply

ModifierWith total runout
MMC or LMCNot allowed. Total runout is always RFS, and datum references are at RMB.
Diameter symbolNot used. The value is a full indicator movement.

Example feature control frame

Example feature control frameFeature control frame: total runout symbol, tolerance 0.05, common datum A-B.0.05A-B

Example: a Ø40 mm bearing seat, 30 mm long, total runout 0.05 mm to datum axis A-B

  1. Support the shaft between centres that represent A-B. Set the indicator on the seat at one end.
  2. Rotate the shaft slowly while traversing the indicator along the full 30 mm using a slide parallel to A-B.
  3. Highest reading +0.019 mm, lowest −0.024 mm over the whole sweep. Total runout = 0.019 − (−0.024) = 0.043 mm.

Result: 0.043 ≤ 0.05, so the seat passes. Circular runout at each section was only about 0.02; the rest is taper.

How it is inspected

Common mistakes

How it relates to neighbouring symbols

Every GD&T symbol page: GD&T symbols chart

Calculators and further reading

Frequently asked questions

Is total runout stricter than circular runout?

Yes. With the same value, a part that passes total runout always passes circular runout, but not the other way round.

Does total runout control cylindricity?

Yes. Every point of the surface must be inside two coaxial cylinders on the datum axis, so form and location are both limited.

Can total runout be applied to a face?

Yes. On a face perpendicular to the axis it controls flatness and perpendicularity to the axis together.

Does total runout need a datum?

Yes, always a datum axis.

How is total runout measured?

Rotate the part on its datum features while moving an indicator along the full surface on a slide parallel to the axis, and take the full range of readings.

Sources

  1. ASME Y14.5-2018 Dimensioning and Tolerancing, ASME
  2. ASME Y14.5-2009 Dimensioning and Tolerancing (for drawings made to the earlier edition), ASME
  3. ISO 1101 Geometrical product specifications (GPS) — Geometrical tolerancing, ISO

COPLAIN AI PLATFORM

Generate yours automatically from your existing docs

Coplain turns total runout setups (centres, slide alignment and the sweep) into inspection job aids your grinding cell can repeat.

Generate yours automatically with Coplain →

Related Tools & Templates