Document Change Request Form

A Word form for proposing a change to a controlled procedure, work instruction or form. It records what changes and why, what else the change affects, who approved it and how it was rolled out.

Who this template is for

Anyone who finds a procedure, work instruction or form that is wrong or out of date, and the document controller, process owner and quality approver who process the request.

When to use it

Standards it supports

How to use this template

  1. Describe the request — enter the document number, title and current revision, and tick the type of change.
  2. Show the change — for each section, write the current content, the proposed content and the reason. Attach a marked-up copy for long changes.
  3. Assess the impact — list other documents, forms, records, training, equipment and customer approvals the change affects.
  4. Review and approve — route the form to the process owner and quality, who approve, reject or send it back for revision.
  5. Implement and close — issue the new revision, update the master list, withdraw old copies, train the people affected and close the request.

Tip: Write the reason as the problem, not the solution: "Operators skipped the coolant check because it was not in the steps" tells reviewers more than "add coolant check".

What's inside the template

1

Request

DCR number, date, requester, department, document number, title and current revision

2

Type of change

New, revision, withdrawal or administrative correction, and urgency

3

Proposed changes

Section, current content, proposed content and reason

4

Impact assessment

Other documents, records, training, equipment, customer and risk impact

5

Review and approval

Role, name, decision, signature and date

6

Implementation

New revision, effective date, master list, withdrawn copies, training and closure

Example: a completed template

Example Request at Example Precision Co., a fictional machine shop, to revise a CNC work instruction after an internal nonconformance. All names, numbers and dates are invented for illustration.

Request

DCR numberDCR-2026-031
Date requested2026-03-02
Requested byProduction Supervisor, CNC
DocumentWI-CNC-012 “Lathe setup and first-off”, rev C
Type of changeRevision, routine

Proposed changes

SectionCurrent contentProposed contentReason
Step 4Fill coolant tank to the line.Fill coolant tank and check concentration with the refractometer: 6–8%.NCR-2026-014: surface finish failures traced to weak coolant; the check was not in the steps.
Step 9Measure first-off part.Measure first-off part and record on form QF-021.First-off results were not being recorded.

Impact and implementation

Other documents affectedForm QF-021 (add coolant column); control plan CP-118 line 3
Training requiredAll 14 lathe operators, read and sign plus demonstration
Customer approvalNot required
ApprovedProcess owner and Quality Manager, 2026-03-06
New revision / effectiveRev D, effective 2026-03-16
Training completed14 of 14 operators by 2026-03-13

The math in this Example

How to fill in each field

FieldWhat to enterExample
DCR numberA unique sequential number from the DCR log, so the request can be traced from the revision history.DCR-2026-031
Document / current revisionNumber, title and the revision the request is based on. A request against an old revision may already be out of date.WI-CNC-012 rev C
Type of changeNew, revision, withdrawal or administrative correction (typos and formatting that change no requirement).Revision
Current / proposed contentThe exact wording or a clear summary of each change. Attach a redline for long documents.Add concentration check, 6–8%
ReasonThe problem or requirement driving the change, with a reference such as an NCR, CAPA or audit finding.NCR-2026-014
Impact assessmentEvery document, form, record, training need, piece of equipment or customer approval the change touches.Form QF-021, control plan CP-118
DecisionApprove, reject (with the reason) or revise and resubmit.Approve
Effective dateWhen the new revision applies. Leave time to train people before it.2026-03-16

Common mistakes

Frequently asked questions

What is the difference between a DCR and an ECN?

A document change request covers procedures, work instructions and forms. An engineering change notice covers product design and drawings, where fit, form, function and customer approval matter.

Who should approve a document change?

At least the process owner and the function responsible for the QMS, usually quality. Add others when the impact assessment shows a change affects them.

Does a typo need a full DCR?

Many companies allow an administrative correction path with a lighter review, as long as no requirement changes. Define the rule in your document control procedure.

How long should a DCR take?

Set a target in your procedure and track it. Long approval times push people to work around the documents.

See also

COPLAIN AI PLATFORM

Generate yours automatically from your existing docs

Describe the change and Coplain drafts the revised work instruction from your current version, ready for review.

Generate yours automatically with Coplain →

Related Tools & Templates