An Excel register of every controlled document: number, title, type, owner, current revision, effective date and where it lives. Formulas work out each next review date and flag documents that are overdue or due soon, so the list doubles as your review schedule.
Document controllers and quality managers in plants that manage controlled documents in shared folders or on paper, and anyone preparing for an audit who needs to show which revision is current.
Set it up when you start controlling documents, update it every time a document is released, revised or made obsolete, and check the summary each month and before every audit.
Tip: Change the due-soon window at the top of the sheet (30 days by default) to match how far ahead owners need to start a review.
Header
Company, list owner, status-as-of date and due-soon window in days
Identification
Document number, title, type and origin (internal or external)
Control
Owner, current revision and effective date
Review schedule
Review interval, calculated next review date and status
Location and change link
Where the controlled copy lives and the latest change reference
Summary
Totals for all documents, overdue, due soon, current and external
Example An excerpt of the list for Example Precision Co., a fictional machine shop, with status as of 2026-07-01 and a 30-day due-soon window. Document numbers and dates are invented for illustration.
| Doc no | Title | Rev | Effective | Interval | Next review | Status |
|---|---|---|---|---|---|---|
| QM-001 | Quality manual | E | 2025-03-10 | 12 mo | 2026-03-10 | Overdue |
| SOP-004 | Control of documented information | C | 2025-07-15 | 12 mo | 2026-07-15 | Due soon |
| WI-2240 | Machining: bracket 10-2240 | B | 2026-02-02 | 24 mo | 2028-02-02 | Current |
| FRM-012 | Nonconformance report form | A | 2024-05-02 | 24 mo | 2026-05-02 | Overdue |
| EXT-003 | ISO 9001:2015 (purchased copy) | 2015 | 2024-01-10 | 36 mo | 2027-01-10 | Current |
| Total documents | 5 |
|---|---|
| Overdue | 2 |
| Due soon | 1 |
| Current | 2 |
| External origin | 1 |
| Field | What to enter | Example |
|---|---|---|
| Doc no | Unique and never reused, with a prefix for the document type. | SOP-004 |
| Type | Manual, procedure, work instruction, form, specification or external standard. | Procedure |
| Origin | Internal, or External for customer drawings, standards and supplier documents you must control. | External |
| Owner | The role responsible for keeping the document accurate and reviewing it. | Quality Manager |
| Current rev | The released revision only. Drafts in work do not belong here until released. | C |
| Effective date | The date the current revision was released for use. | 2025-07-15 |
| Review interval (months) | Your chosen interval. ISO 9001 does not set one; many plants use 12 to 36 months by document type. | 12 |
| Next review / Status | Calculated: effective date plus interval, compared with the as-of date. Do not type over these cells. | 2026-07-15 / Due soon |
| Location | Where the controlled copy lives: system path, binder or station. | QMS share / Procedures |
| Change ref | The ECN or change request behind the current revision. | ECN-2026-041 |
Not by name. It requires documents to be identified, version-controlled and available, and a master list is the most common way to show that. Document control software that lists current revisions serves the same purpose.
Usually not. Records such as completed forms are evidence, not controlled documents. Many companies keep a separate records retention list showing each record type, where it is kept and for how long.
ISO 9001 does not set an interval. Choose one per document type, and review earlier when a process, product or requirement changes.
List them with their source and the revision you are using, name an owner who checks for updates, and mark them External so they are counted separately.
The blank sheet uses TODAY() by default. The cell can be overwritten with a fixed date to reproduce the status on a past date, for example the day of an audit.