A metal fabrication shop runs short jobs, frequent changeovers and a lot of skilled judgement, often with a mixed crew of experienced and new operators. Good work instructions here are short, visual and focused on the steps that cause rework or injury: blank layout, bend sequence, weld procedure, and safe setup of brakes, shears and lasers.
Last updated
Quality systems and welding codes
Most fab shops certify to ISO 9001 and add requirements by customer. ISO 9001 asks for controlled conditions in production, including the documented information people need, suitable equipment, competent people and validation of processes whose output cannot be fully checked afterwards. Welding is the classic example: a finished weld cannot be fully inspected without destroying it, so the procedure and the welder’s qualification carry much of the proof.
Structural and pressure work brings welding codes. AWS D1.1 covers structural steel welding in North America and requires qualified welding procedure specifications (WPS) and qualified welders. ISO 3834 sets quality requirements for fusion welding and is commonly asked for in Europe. Aerospace or defence work brings AS9100 on top. The weld symbols reference helps everyone read the drawing the same way.
Safety rules that belong in the instruction
Press brakes, shears, punches, lasers and welding cells carry serious hazards. In the United States, OSHA’s lockout/tagout standard requires energy-control procedures for servicing and maintenance, and machine guarding rules apply to operation. A work instruction should not copy the full safety procedure, but it should state the hazards at each step and point to the lockout/tagout procedure and the job safety analysis for that machine.
Put guarding and hand-position warnings in the step where the hazard occurs.
Say which tooling changes need lockout and which can be done with the machine in a safe mode.
Keep the WPS number on the weld instruction so the welder knows which procedure applies.
The templates and tools that matter most
Coplain pages for metal fabrication shops, in priority order
Checks dimensions, welds and finish before shipping.
Example: Press brake setup and first-bend check
Example An excerpt from a work instruction at Ironwood Fabrication, a fictional fab shop. Part, tooling and dimensions are example values; use your own drawing, tooling chart and machine manual.
Lock out and change tooling. Lock out PB-2 following its LOTO procedure, then install the punch and die listed on the setup sheet. Key point: Verify zero energy by trying the controls before you reach into the tooling area. Reason: Tooling changes put hands between the punch and die.Safety: Never change tooling with the ram powered.
Load the program. Remove the lockout, load the program for 2210-14 and check the program revision against the setup sheet. Key point: The program revision must match the drawing revision on the header. Reason: An old program bends to an old drawing.
Bend a test blank. Bend a blank from the same material lot through all three bends in the programmed sequence. Key point: Follow the sequence; bending out of order can make bend 3 impossible. Reason: The sequence is set so the part clears the tooling.Safety: Keep hands outside the light curtain; support long parts from the side.
Check the first piece. Measure flange A height, each bend angle and the overall width, and record them with the gauge IDs. Key point: Adjust the back gauge or angle correction only, then bend a new blank. Reason: Measuring an adjusted part hides the setup error.
Release. Tag the approved first piece, sign the setup record and start the run. Key point: Keep the first piece at the brake until the job is complete. Reason: Gives operators a physical standard to compare against.
Acceptance criteria
Flange A height and overall width within drawing tolerance
All bend angles within drawing tolerance
Setup record signed with program revision and gauge IDs
Common audit findings
These are the kinds of findings auditors and customers commonly write in this industry, with a way to prevent each one in the instruction itself.
Welders are working to a procedure that is not identified, or that they are not qualified for. Put the WPS number on the weld instruction and check welder qualifications against it.
Programs for brakes, lasers or punches are not under revision control. Name programs with the drawing revision and check them at setup, as in the Example above.
Material certificates do not trace to the parts made. Record heat or lot numbers on the traveler at cutting and carry them through.
Safety procedures exist but are not referenced where the hazard occurs. Add hazard notes and LOTO references to the step itself.
Measuring tools on the floor are uncalibrated or unidentified. Log every tool in a calibration log and label it with its ID and due date.
Frequently asked questions
Do small fab shops need written work instructions?
For repeat parts, critical bends and welds, and anything a new operator might get wrong, yes. ISO 9001 lets you decide how much detail is needed based on risk and competence, but customers usually expect the critical steps in writing.
Is a WPS the same as a work instruction?
No. A WPS sets the qualified welding variables. A work instruction covers the job around it: fit-up, sequence, inspection and handling. The instruction should reference the WPS rather than repeat it.
How detailed should a press brake instruction be?
Detailed enough to set up and verify the job without asking: tooling, program, sequence, first-piece checks and hazards. Photos of the bend sequence often replace paragraphs of text.
Should lockout steps go in the work instruction?
Reference the machine’s lockout procedure at the step where it applies. Keep the full procedure separate so it is maintained in one place.
Sources
ISO 9001:2015 Quality management systems — Requirements, ISO
AWS D1.1 Structural Welding Code — Steel, American Welding Society
ISO 3834 Quality requirements for fusion welding of metallic materials, ISO
Turn your documents into audit-ready work instructions