TEMPLATESTURTLEFree Word (.docx) download

Turtle Diagram Template

A one-page Word turtle diagram for a single process. The body holds the process and its owner, the head and tail hold inputs and outputs, and the four legs hold the equipment and materials (with what), the people and their competence (with whom), the methods (how), and the measures with their targets and current results.

Who this template is for

When to use it

Standards it supports

How to use this template

  1. Name the process and owner — one process per turtle, with the person accountable for its results.
  2. Fill inputs and outputs — list what triggers and feeds the process and what it delivers, with the customer of each output.
  3. Fill the four legs — list the equipment and materials, the roles and competence, the controlling documents, and the measures.
  4. Add targets and results — for each measure, write the target and the latest result so gaps are visible.
  5. Use it to audit — turn each box into questions and sample evidence for each one on the floor.

Tip: Name documents, equipment and roles specifically, with document numbers and revisions. An auditor can sample “WI-210 rev D” on the floor; “work instructions” tells them nothing.

What's inside the template

1

Process (body)

Process name, owner, scope, and the processes before and after it

2

Inputs (head)

Orders, material, drawings and information that start and feed the process

3

Outputs (tail)

Product, records and information the process delivers, and who receives them

4

With what

Equipment, tooling, gauges, software and materials

5

With whom

Roles, required competence and training

6

How and measures

Procedures, work instructions and control plans; each measure with its target and current result

Example: a completed template

Example Turtle diagram for CNC machining of pump housings at Example Machining Co., a fictional job shop. The documents, targets and monthly results are invented for illustration.

Process

ProcessCNC machining of pump housings
OwnerMachining Supervisor
Before / afterReceiving inspection / deburr and wash

Turtle diagram

ElementEntries
InputsWork order and traveler; castings released by receiving inspection; drawing PH-40 rev F; CNC program PH-40-OP10 rev 3
OutputsMachined housings to deburr; completed traveler; first-piece and in-process inspection records
With whatCNC machining centers MC-2 and MC-3; fixture FX-40; calibrated bore gauge and CMM program; coolant
With whomCNC operators trained on WI-210 (skills matrix level 3); setup tech; quality tech for first piece
HowWork instruction WI-210 rev D; control plan CP-PH40; first-piece inspection procedure; reaction plan for out-of-tolerance bores
MeasuresScrap rate (target ≤ 2.0%); on-time completion to deburr (target ≥ 95%); first-piece passed first time

Measures for September (Example)

MeasureTargetDataResultStatus
Scrap rate≤ 2.0%18 scrapped of 1,200 machined1.5%Met
On-time completion to deburr≥ 95%47 of 50 jobs on time94.0%Not met

The math in this Example

How to fill in each field

FieldWhat to enterExample
ProcessOne process that turns inputs into outputs. Too wide (“production”) and nothing is specific; too narrow (“load part”) and it is a step.CNC machining of pump housings
OwnerThe role accountable for the process meeting its targets, not the whole department.Machining Supervisor
InputsWhat starts and feeds the process: orders, material, specifications and information from the previous process.Castings released by receiving inspection
OutputsWhat the process delivers, including records, and who receives each output.Machined housings to deburr; inspection records
With whatEquipment, tooling, fixtures, gauges, software and consumables, with IDs.MC-2, MC-3, fixture FX-40
With whomRoles and the competence each needs, and where that competence is recorded.CNC operator, skills matrix level 3
HowThe controlling documents, with numbers and revisions: procedures, work instructions, control plan, reaction plan.WI-210 rev D; CP-PH40
MeasuresTwo to four measures that show whether the process works, each with a target, a data source and the latest result.Scrap rate ≤ 2.0%, monthly

Common mistakes

Frequently asked questions

What is a turtle diagram?

A one-page picture of a single process. The process sits in the body, inputs and outputs are the head and tail, and the four legs show what the process needs: equipment and materials, people, methods and measures.

Does IATF 16949 require turtle diagrams?

No. IATF 16949 and ISO 9001 require you to determine your processes, their inputs, outputs, resources and measures, and to audit them, but they do not name a format. Turtle diagrams are a common way to show that information, and many auditors use them.

How is a turtle diagram used in an audit?

Each box becomes a set of questions. The auditor checks that the inputs are right, the equipment is suitable and calibrated, people are competent, methods are current and followed, and measures meet targets, then follows the outputs to the next process.

What is the difference between a turtle diagram and a SIPOC?

A SIPOC shows the flow from suppliers to customers at a high level. A turtle diagram looks inside one process and adds the resources, people, methods and measures it needs.

How many measures should a turtle diagram have?

A few that show whether the process is working, usually covering quality, delivery and sometimes cost. Each needs a target, a data source and a current result.

See also

COPLAIN AI PLATFORM

Generate yours automatically from your existing docs

When an audit finds the “How” leg out of date, describe the change to Coplain’s Document Update Assistant. It places the edit in each affected procedure and returns a redlined Word file for review.

Generate yours automatically with Coplain →

Related Tools & Templates