TEMPLATESSUPPLIERFree Word (.docx) download

SCAR Template (Supplier Corrective Action Request)

A supplier corrective action request (SCAR) is the formal notice you send a supplier when their product or service fails a requirement. It states the nonconformance, asks the supplier to contain it, find the root cause and fix it, and records how you verified the fix. Use this template to issue the request and track the response to closure.

Who this template is for

When to use it

Standards it supports

How to use this template

  1. Document the nonconformance — record the requirement, what was found, quantities and evidence, and link the NCR.
  2. Set response dates — give dates for containment, root cause and corrective action from your purchase terms.
  3. Require containment — have the supplier cover every location suspect product could be: your stock, theirs and in transit.
  4. Review the response — check that the root cause covers both why it happened and why it escaped, and that actions address it.
  5. Verify and close — close only after your own verification, such as clean receiving results on later lots.

What's inside the template

1

Request

SCAR number, Date issued, Linked NCR number, Supplier / site, Supplier contact, Part number / revision, PO number, Lot / batch, Qty received, Qty inspected, Qty nonconforming, Issued by, Containment due, Root cause and action plan due

2

Nonconformance

Requirement (drawing / spec reference), Actual condition found, Evidence attached

3

Containment

Location, Qty checked, Qty nonconforming, Action taken, Date

4

Root cause

Why it occurred, Why it was not detected, Method used (5 Why, fishbone, other)

5

Corrective action

Action, Addresses cause, Owner, Due date, Status

6

Verification and closure

Verification method, Verification result, Accepted by, Closure date

Example: a completed template

Example Example Manufacturing Co., a fictional manufacturer, receives turned steel pins from Example Supplier Inc. Response times are the Example company’s own purchase terms, not a standard requirement. All figures are illustrative.

Request

SCAR numberSCAR-0031
Part / revisionPIN-045 rev D
RequirementOutside diameter 6.00 mm +0.00/−0.02 (drawing)
ActualOD measured 6.01–6.02 mm on out-of-tolerance pins
QuantityLot of 500 received; 4 of 50 sampled out of tolerance
Response dueContainment in 1 business day; root cause and action plan in 30 days (Example terms)

Containment

LocationQty checkedQty nonconformingAction
Example Manufacturing Co. stock50023Sorted 100%; rejects returned to supplier
Supplier finished goods1,2000Sorted 100% before next shipment
In transit0—None in transit

Supplier response (summary)

The math in this Example

How to fill in each field

FieldWhat to enter
SCAR number and dateA unique number and the issue date. Cross-reference the NCR that triggered the SCAR.
Supplier and contactSupplier name, site and the person responsible for the response. Send to someone who can act, not a generic sales inbox.
Part, revision, PO, lotIdentifiers for the affected product. The lot number is what lets the supplier trace and contain.
Requirement vs actualThe specified requirement and what was found. Quote the drawing or spec by number; attach photos and data.
Quantity affectedReceived, inspected and nonconforming quantities. Show how you got the numbers so the supplier can check them.
Response due datesDates for containment, root cause and corrective action. Use the timelines in your purchase terms or supplier quality manual.
ContainmentWhere suspect product could be and what was done at each location. Cover your stock, supplier stock and anything in transit.
Root causeVerified cause of the occurrence and of why it escaped. Ask for both; escape causes are often in the supplier’s inspection.
Corrective actionActions, owners and dates. Actions should address the verified cause, not just re-train.
Verification of effectivenessHow and when you confirmed the fix worked. Define this up front, e.g. a number of clean lots.
ClosureWho accepted the response and when. Do not close until verification is complete.

Common mistakes

Frequently asked questions

What does SCAR stand for?

Supplier corrective action request. Some companies call it a supplier corrective action report or simply a supplier CAR.

Is a SCAR the same as an 8D?

A SCAR is the request; an 8D is one common format a supplier uses to answer it. Many companies ask suppliers to respond in 8D format.

How long should a supplier have to respond?

There is no single required timeline. Set response times in your purchase terms or supplier quality manual and apply them consistently.

When should I issue a SCAR instead of handling it informally?

Define criteria — for example repeat issues, safety or fit-and-function defects, or customer impact — so the decision is consistent rather than ad hoc.

Who closes the SCAR?

The issuing company closes it after verifying the corrective action worked, not when the supplier submits a response.

See also

COPLAIN AI PLATFORM

Generate yours automatically from your existing docs

When a supplier’s corrective action changes your inspection or work instructions, describe the change to Coplain’s Document Update Assistant and it returns a redlined Word file for review.

Generate yours automatically with Coplain →

Related Tools & Templates