How to Run a Gauge R&R Study

To run a gauge R&R study, pick 10 parts that span the real process range, 3 operators who normally use the gauge, and have each operator measure every part 3 times in random order without seeing earlier results. From the ranges you get equipment variation (repeatability). From the differences between operator averages you get appraiser variation (reproducibility). Combine them into GRR and compare it with total variation and with the tolerance. Under 10% is generally acceptable, 10–30% may be acceptable depending on the use, and over 30% means the gauge needs work.

By Coplain Team

Last updated

Step by step

  1. Define the characteristic and check the gauge — name the characteristic, the tolerance and the gauge, and confirm the gauge is calibrated and its resolution is no coarser than one tenth of the tolerance. Record it on the calibration log. An uncalibrated or coarse gauge wastes the study.
  2. Select 10 parts that span the process — pull parts from different times, lots or machines so they cover the normal process range. Ten consecutive parts from one setup look nearly identical and make any gauge look bad on the percent-of-total-variation measure.
  3. Choose 3 operators — use people who measure this characteristic in daily work, across shifts if possible. Hand-picking the best inspector hides the reproducibility you are trying to measure.
  4. Number the parts blind and randomize the order — mark parts so operators cannot see the number, and give each operator the parts in a different random order on each trial. Operators should not see their own or anyone else’s earlier readings.
  5. Collect 3 trials per operator per part — that is 10 × 3 × 3 = 90 readings. Record every reading at full gauge resolution, with the same method, location on the part and fixture each time. Write down anything unusual as it happens.
  6. Calculate ranges and averages — for each operator and part, find the range of the 3 trials. Average those ranges per operator and then across operators to get R̿. Check every range against the upper control limit D₄ × R̿ (D₄ = 2.574 for 3 trials); a range above it is a measurement error to investigate and repeat. Then find each operator’s overall average, the difference between the highest and lowest (X̄diff), and the range of the 10 part averages (Rp).
  7. Calculate EV, AV, GRR, PV and TV — EV = R̿ × K₁. AV = √[(X̄diff × K₂)² − EV² ÷ (n × r)], where n is parts and r is trials (set AV to 0 if the term is negative). GRR = √(EV² + AV²). PV = Rp × K₃. TV = √(GRR² + PV²). For 3 trials, 3 operators and 10 parts, K₁ = 0.5908, K₂ = 0.5231 and K₃ = 0.3146. The gage R&R calculator does this arithmetic from your readings.
  8. Judge the result and act — compute %GRR = 100 × GRR ÷ TV, %tolerance = 100 × 6 × GRR ÷ (USL − LSL), and ndc = 1.41 × PV ÷ GRR, rounded down. Compare with the guidelines below. If EV dominates, look at the gauge and fixture. If AV dominates, look at the method and training.

Repeatability and reproducibility in plain words

Repeatability, or equipment variation (EV), is the spread you get when one person measures the same part with the same gauge several times. It comes from the gauge, the fixture, and how consistently the part sits in it. Reproducibility, or appraiser variation (AV), is the difference between people measuring the same parts. It comes from technique, reading habits, and unclear instructions.

GRR combines the two. The study then compares GRR with the spread of the parts (PV) and with the tolerance. Because variances add and standard deviations do not, the percentages never add up to 100. Their squares do.

Acceptance guidelines

The AIAG Measurement Systems Analysis manual describes a measurement system with GRR under 10% as generally acceptable. Between 10% and 30% it may be acceptable depending on how important the measurement is, what a better gauge would cost, and the customer’s view. Above 30% it is considered unacceptable and needs improvement. The same manual suggests the number of distinct categories (ndc) should be 5 or more, so the gauge can tell meaningfully different parts apart.

Use %tolerance when the gauge is used to accept or reject parts, and %total variation when it is used to control the process, for example on an SPC chart. Customers may set their own limits, so check their requirements. The calibration management guide covers where MSA fits in your gauge control system.

Why the study comes before capability

Every capability index includes measurement variation in its sigma. A noisy gauge makes a good process look marginal and can hide real shifts on a control chart. Run the gauge study first, then the capability study with Cpk in Excel or the process capability calculator. Cpk vs Ppk explains which index to report.

The average and range method in this guide is easy to do by hand or in a spreadsheet. The ANOVA method uses the same data and also separates out operator-by-part interaction, so it is preferred when software is available. The two methods usually give similar GRR when there is no strong interaction.

Worked examples

Example: A height gauge measuring a step of 6.00 ± 0.20 mm, so the tolerance is 0.40 mm (fictional data). 10 parts, 3 operators, 3 trials. Average ranges: operator A 0.024 mm, B 0.029 mm, C 0.022 mm. Operator averages: A 6.012, B 6.004, C 6.021 mm. Part averages range from 5.842 to 6.152 mm.

  1. R̿ = (0.024 + 0.029 + 0.022) ÷ 3 = 0.025 mm; range limit = 2.574 × 0.025 = 0.064 mm, and no single range exceeds it
  2. X̄diff = 6.021 − 6.004 = 0.017 mm; Rp = 6.152 − 5.842 = 0.310 mm
  3. EV = 0.025 × 0.5908 = 0.01477 mm
  4. AV = √[(0.017 × 0.5231)² − 0.01477² ÷ 30] = √(0.00007908 − 0.00000727) = 0.00847 mm
  5. GRR = √(0.01477² + 0.00847²) = 0.01703 mm
  6. PV = 0.310 × 0.3146 = 0.09753 mm; TV = √(0.01703² + 0.09753²) = 0.09900 mm
  7. %EV = 14.9%, %AV = 8.6%, %GRR = 100 × 0.01703 ÷ 0.09900 = 17.2%
  8. %tolerance = 100 × 6 × 0.01703 ÷ 0.40 = 25.5%
  9. ndc = 1.41 × 0.09753 ÷ 0.01703 = 8.07, rounded down to 8

Result: GRR is 17.2% of total variation and 25.5% of tolerance, both in the 10–30% band, with ndc 8. The gauge may be acceptable for this characteristic depending on its importance and the customer. EV is larger than AV, so improvement should start with the gauge and fixture, for example a dedicated locating fixture, rather than operator training.

Common mistakes

Frequently asked questions

Is it gauge R&R or gage R&R?

Both. “Gage” is the spelling used in the AIAG manuals and US automotive practice, and “gauge” is the general English spelling. They mean the same study.

Do I always need 10 parts, 3 operators and 3 trials?

It is the common layout and the one the K constants above assume. Smaller studies such as 5 parts × 2 operators × 2 trials are possible but give a much less reliable estimate. Use the constants for your layout.

What is ndc?

The number of distinct categories: how many groups of parts the gauge can reliably tell apart within the process spread. It is 1.41 × PV ÷ GRR, rounded down. A value of 5 or more is the usual guideline.

What if the AV term under the square root is negative?

Set AV to zero. It means the difference between operators is smaller than what repeatability alone would produce.

How is a gauge R&R different from calibration?

Calibration checks a gauge against a reference standard for accuracy. A gauge R&R checks the variation of the whole measurement process, including people, method and fixture, on real parts.

Sources

  1. Measurement Systems Analysis (MSA) Reference Manual, 4th edition, AIAG
  2. NIST/SEMATECH e-Handbook of Statistical Methods, section 2.4 Gauge R & R studies, NIST
  3. Introduction to Statistical Quality Control, Douglas C. Montgomery, Wiley
  4. ISO 22514-7, Statistical methods in process management — Capability and performance — Part 7: Capability of measurement processes, ISO

See also

COPLAIN AI PLATFORM

Generate yours automatically from your existing docs

When a gauge study shows operators measuring differently, Coplain turns your inspection method into a clear, illustrated job aid so every shift measures the same way.

Generate yours automatically with Coplain →

Related Tools & Templates